Concurrent Therapy Productivity Calculator

Enter your start time, billable therapy minutes, and productivity target to get Total time worked and a Perfect end time. Add concurrent or group adjustments if your facility credits those minutes differently.
Concurrent / group adjustments (optional)
Concurrent is fixed at 2 patients. Group allows 2-6.

Billing rules vary by payer and setting. This tool estimates credited minutes for productivity tracking. Confirm your facility/payer policy.

Total time worked is

Perfect end time is

Adjusted billable minutes (credited):
Base billable minutes + concurrent/group credited minutes = adjusted billable minutes.

Rules snapshot (informational)

Frequently Asked Questions

Does concurrent therapy count as double minutes?

It depends on your facility and payer. Use the crediting model selector to match how your productivity tracking counts concurrent time.

Concurrent vs group therapy: what is the difference?

Concurrent is typically two patients doing different activities with line-of-sight. Group is two to six patients doing the same or similar activity.

Why does Medicare Part B treat concurrent as group?

Part B does not define a concurrent category for PT/OT; simultaneous treatment is billed as group under 97150 guidance.

How does this differ for SLP?

Group speech therapy uses 92508, and not all payers allow all diagnosis types. Confirm your payer rules.

What is the PDPM 25% group/concurrent limit?

PDPM caps combined concurrent and group minutes at 25% of total therapy minutes per discipline in a SNF Part A stay.

How should I set the crediting method?

Pick the method that matches how your productivity system credits minutes. If unsure, ask your rehab manager or billing lead.

What happens if I leave concurrent minutes at zero?

The calculator behaves like the standard productivity calculator with no adjustments.

Related tools: Standard productivity calculatorLunch break calculatorUtilizationCaseloadBilling units